At the outset of manufacturing, Mainartery Project Management communicates to production parties the final brief with all defining specifications and engineering. These include grades of materials, construction methods and detail, fixing details, foundation frames, final finishing, project plan and time frames, logistics plan and payment allocations.
In our initial briefing with you, we raise the issue of which country’s engineering standards should apply. As a default we work to Australian standards, many of which are based on British and European standards, generally considered to be world’s best.
Our core foundries are in partnership with us for lifetime relationships, and that is key to passing on the best manufactured quality to you.
In creating sculptures, we also form legacies that must stand the tests of time, value and exposure. We succeed because our processes are geared to allow the right manufacturing decisions to be made precisely when needed.